Aadhaar verification for all mobile phone users soon; may cost Rs 1K-cr

March 27, 2017

New Delhi, Mar 27: Now, mobile phone users in the country will have to take up a verification process which will require them to produce their Aadhaar card number. With the government instructing telecom operators to initiate the process in this regard, existing subscribers will also have to go through mandatory Aadhaar-based verification to continue using the service. "All licensees (telecom operators) shall re-verify all exiting mobile subscribers (prepaid and postpaid) through Aadhaar-based eKYC process (a paperless Know Your Customer process)," according to a Department of Telecom notification.

aadhar
But it still remains to be seen how much this task would cost the operators.

The Cellular Operators Association of India has backed the move and aims to complete the exercise within one year. "The issue of fake subscribers will go away. We will try our best to cover the entire base within the stipulated timeframe of one year but in case we cannot, we may ask DoT for an extension," COAI Director General Rajan Mathews said.

Members of COAI expect modalities of rolling out the verification process for over a billion users to cost the operators nearly Rs. 1,000 crore for infrastructure and training. Licensees will have to inform existing subscribers - through advertisements in print and electronic media and SMS - about the Supreme Court order for the re-verification.

The Supreme Court had in an order in February observed that "an effective process has been evolved to ensure the identity verification, as well as, the addresses of all mobile phone subscribers for the new subscribers".

The telecom operators have also been asked to upload the details of the Aadhaar exercise on their website. The Department of Telecom has said they will use and share a common device ecosystem through mutual agreements. The operators will also work out mechanisms to avoid public inconvenience and long queues, it added.

For re-verification through an Aadhaar-based eKYC process, operators will send a verification code to subscribers on their mobiles. Prior to starting the eKYC process, the operator will verify this code from the subscriber so as to confirm the SIM card of the mobile connection is physically available with the user. "After the completion of the eKYC process, before updating or overwriting the old subscriber detail in database with the data received through eKYC process, the licensee will seek confirmation from the subscriber about the re-verification of his/her mobile number after 24 hours through SMS," the notification said.

Verification of a subscriber would not be required in case of conversions - pre-paid to postpaid connections or vice versa - it added.

Meanwhile, the Supreme Court on Monday said Aadhaar cannot be made mandatory for availing benefits under social welfare schemes. The government also said recently that Aadhaar cards will be made mandatory for filing tax returns and applying for driving licences.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
December 19,2025

Mangaluru: In a decisive move to tackle the city’s deteriorating sanitation infrastructure, the Mangaluru City Corporation (MCC) has announced a massive ₹1,200 crore action plan to overhaul its underground drainage (UGD) network.

The initiative, spearheaded by Deputy Commissioner and MCC Administrator Darshan HV, aims to bridge "missing links" in the current system that have left residents grappling with overflowing sewage and environmental hazards.

The Breaking Point

The announcement follows a high-intensity phone-in session on Thursday, where the DC was flooded with grievances from frustrated citizens. Residents, including Savithri from Yekkur, described a harrowing reality: raw sewage from apartments leaking into stormwater drains, creating a "permanent stink" and turning residential zones into mosquito breeding grounds.

"We are facing immense difficulties due to the stench and the health risks. Local officials have remained silent until now," one resident reported during the session.

The Strategy: A Six-Year Vision

DC Darshan HV confirmed that the proposed plan is not a temporary patch but a comprehensive six-year roadmap designed to accommodate Mangaluru’s projected population growth. Key highlights of the plan include:

•    Infrastructure Expansion: Laying additional pipelines to connect older neighborhoods to the main grid.

•    STP Crackdown: Stricter enforcement of Sewage Treatment Plant (STP) regulations. While new apartments are required to have functional STPs, many older buildings lack them entirely, and several newer units are reportedly non-functional.

•    Budgetary Push: The plan has already been discussed with the district in-charge minister and the Secretary of the Urban Development Department. It is slated for formal presentation in the upcoming state budget.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
December 5,2025

Mangaluru: In a significant step to curb online hate and intimidation, Mangaluru City Police have registered a suo motu case against multiple Instagram accounts accused of circulating alleged provocative and threatening content.

While monitoring social media activity on Tuesday, Kankanady Town PSI Anitha Nikkam identified the Instagram handle ‘team_targetttt_900’ for posting a hate message alongside images of lethal weapons. Another account, ‘team_nagara_900’, allegedly shared a threatening post targeting activist Bharath Kumdelu, tagging additional pages such as KARAVALI-OFFICIAL.

Several other accounts — including ‘immu_bhai.fan’, ‘target_boy_900’, ‘kings_of_manglore’, ‘team_target_boys.900’, ‘arshad_mangalore’, ‘target_ka19_ullal’, ‘team_target__’, ‘troll_tigersz_900’, ‘tr_group_900’, and ‘team_target_900’ — are also under scrutiny for spreading similar inflammatory material, police said.

Authorities have urged citizens, especially young social media users, to report suspicious pages and avoid engaging with groups that glorify violence or threaten individuals. Online hate can quickly escalate into real-world harm, and police stress that sharing or promoting such content can attract legal consequences.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
December 19,2025

Mangaluru: Public transport in Mangaluru is set for a state-led transformation as the government moves to deploy 100 new electric govt buses to replace unreliable private services. The initiative aims to provide a dependable alternative to private operators who have been frequently "cutting trips," leaving thousands of commuters stranded.

The announcement was made by Deputy Commissioner and MCC Administrator Darshan HV during a public phone-in session. The move specifically targets routes where private bus service has become erratic, ensuring that citizens no longer have to rely on a fluctuating private sector for their daily commute.

Restoring the Govt Presence

The transport crisis was brought to the forefront by Ramayya, a resident of Bajal, who highlighted a growing trend of private buses skipping morning and night trips. With the previous KSRTC (govt) services discontinued, residents have been left without a fallback option.

To fix this, the DC confirmed that the PM-eBus Sewa Scheme will bring 100 government-owned electric buses to the city:

•    Phased Deployment: The first 50 of the new 100 government buses are scheduled to arrive by March 2026.

•    State Infrastructure: Two new government depots, including one at Mudipu, are being prepared for operations.

•    Recruitment: The state has already begun training a new batch of government bus drivers to ensure the fleet is operational the moment it arrives.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.