 the kalbavi road in kottara ashok nagar was provided with ugd pipe line during last year. as usual the centre of road was dug up in march 2018 for this purpose making the road not motorable during the monsoon of 2018.

 the asphalt work is now planned now during nov2018 by mcc. this road is very narrow and not having the foot path or road side drain at all. 

 

both the ugd agency as well as the asphalting agency have put the muck/soil on the sides of the road, making it now impossible to walk when there is traffic. also during monsoons , storm water from the entire stretch for about 500 ft will flow on this road itself which is diverted to my compound/pure water sump due to the faulty work of mcc.

in spite of repeated requests/complaints to the commissioner,corporators, engineers of mcc, publishing of the photos of the same in some news papers,action is yet to be taken.

now at least it is requested to remove all the above dumped muck /soil on either sides of this road which is also preventing the entry of monsoon water th the existing drain near the starting point of sagar court.