Babri demolition: SC restores criminal conspiracy charge against BJP leaders

April 19, 2017

New Delhi, Apr 20: The Supreme Court on Wednesday ordered that senior BJP leaders L K Advani, Murli Manohar Joshi and union minister Uma Bharti face criminal conspiracy charges for their role in the 1992 Babri Masjid demolition case.

babri

The apex court observed that the case shook the secular fabric of the Constitution 25 years ago. The top court also stated that the accused could not be tried because of “technical defects” and the conduct of the CBI and the Uttar Pradesh government.

A bench of Justices P C Ghose and R F Nariman ordered the separate trials being conducted in trial courts at Raebareli and Lucknow to be clubbed and conducted in the capital of Uttar Pradesh. It directed completion of the trial in two years.

There will be no fresh trial because of framing of conspiracy charges against the senior BJP leaders, the court said. However, the Lucknow court would face an onerous task because of about 800 witnesses in the case.

Abetment charge

Allowing the CBI's plea, the bench directed, “The court of sessions (Lucknow) will frame an additional charge under Section 120-B (of the IPC) against Advani, Vinay Katiar, Uma Bharti, Sadhvi Ritambara, Joshi and Vishnu Hari Dalmia.”

Former Uttar Pradesh chief minister Kalyan Singh could be spared for now for being the Rajasthan governor.

He enjoys immunity under Article 361 of the Constitution as long as he holds Governor's office. The sessions court will frame charges and move against him as soon as he ceases to be governor, the apex court said.

In a strong observation against the CBI, the bench said, “In the present case, crimes which shake the secular fabric of the Constitution of India have allegedly been committed almost 25 years ago.”

The accused have not been brought to book largely because of the conduct of the CBI in not pursuing the prosecution of the alleged offenders in a joint trial, and because of technical defects, which were easily curable, but not cured by the state government,” it said.

The bench rejected the plea of Advani and others that the court should not exercise its jurisdiction under Article 142 to order transfer of the pending matter before the Raebareli court to the Lucknow sessions court. “Almost 25 years have gone and yet we are solemnly reminded that Respondent Nos 4 and 5’s fundamental rights (of fair trial) should not be curtailed by any order passed under Article 142,” the bench said.

Daily trial

The Lucknow court was directed to conduct proceedings on a day-to-day basis until the conclusion of the trial. “There shall be no transfer of the judge conducting the trial until the entire trial concludes. The case shall not be adjourned on any ground except when the sessions court finds it impossible to carry on the trial for that particular date. In such an event, on grant of adjournment to the next day or a closely proximate date, reasons for the same shall be recorded in writing.”

The court also directed the CBI to ensure some witnesses were examined on every date of the hearing.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
December 19,2025

Mangaluru: In a decisive move to tackle the city’s deteriorating sanitation infrastructure, the Mangaluru City Corporation (MCC) has announced a massive ₹1,200 crore action plan to overhaul its underground drainage (UGD) network.

The initiative, spearheaded by Deputy Commissioner and MCC Administrator Darshan HV, aims to bridge "missing links" in the current system that have left residents grappling with overflowing sewage and environmental hazards.

The Breaking Point

The announcement follows a high-intensity phone-in session on Thursday, where the DC was flooded with grievances from frustrated citizens. Residents, including Savithri from Yekkur, described a harrowing reality: raw sewage from apartments leaking into stormwater drains, creating a "permanent stink" and turning residential zones into mosquito breeding grounds.

"We are facing immense difficulties due to the stench and the health risks. Local officials have remained silent until now," one resident reported during the session.

The Strategy: A Six-Year Vision

DC Darshan HV confirmed that the proposed plan is not a temporary patch but a comprehensive six-year roadmap designed to accommodate Mangaluru’s projected population growth. Key highlights of the plan include:

•    Infrastructure Expansion: Laying additional pipelines to connect older neighborhoods to the main grid.

•    STP Crackdown: Stricter enforcement of Sewage Treatment Plant (STP) regulations. While new apartments are required to have functional STPs, many older buildings lack them entirely, and several newer units are reportedly non-functional.

•    Budgetary Push: The plan has already been discussed with the district in-charge minister and the Secretary of the Urban Development Department. It is slated for formal presentation in the upcoming state budget.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.