Local residents bring Suratkal-Kana-MRPL road to a standstill

[email protected] (CD Network)
October 26, 2016

Mangaluru, Oct 26: An atmosphere of bandh prevailed in the Suratkal-Kana-MRPL road area on Wednesday with local residents closing their shops and business establishments to support the ongoing agitation demanding repair of the unmotorable stretch.

mrplroad 3

The 4.5-km stretch wore a deserted look since 7 a.m. and the blockade continued till 5 p.m. Buses, auto-rickshaws remained off the road. Interestingly dozens of giant vehicles that ply to and from MRPL everyday also were missing on the stretch till evening.

Even though the area witnessed several protest in the past against the road, this is for the first time all the residents in the area joining the agitation, said a member of the Nagarika Horata Samiti, Kana, which had called for dawn to dusk road blockade today.

Addressing a protest meet at Kana junction Samiti convener B.K. Imtiyaz said that Dakshina Kananda MP Nalin Kumar Kateel, local MLA Mohiuddin Bava, MCC, MRPL and the other giant companies such as HPCL and BASF that operate thousands of heavy vehicles on the road, are collectively responsible for the present situation of the road.

He said that the MCC is trying to shrink away from its responsibility of repairing the road by merely blaming it on the MRPL.

This is the seventh protest staged by the Samiti urging the Mangalore Refinery and Petrochemicals Ltd and Mangaluru City Corporation to repair the road. Today's protest comes after the MCC and MRPL failed to reach an agreement over taking up the repair work.

“So far we have staged peaceful protest. But, now we are losing patience. The elected representatives should fulfil their duties,” said a protestor.

Also Read: MLA Mohiuddin Bava snubs road agitators, flies to Saudi Arabia

mrplroad 1

mrplroad 2

mrplroad 5

mrplroad 4

mrplroad 6

mrplroad 7

surathkal 1

surathkal 2

surathkal 3

surathkal 4

surathkal 5

surathkal 6

surathkal 7

surathkal 8

surathkal 9

surathkal 10

surathkal 11

surathkal 12

surathkal 13

surathkal 14

surathkal 15

surathkal 16

surathkal 17

surathkal 18

surathkal 19

Comments

shahid
 - 
Thursday, 27 Oct 2016

this MLA will be his last tenure in his life

Abdullah
 - 
Wednesday, 26 Oct 2016

Gr8..after long time it luks like all the religion ppl came together to protest against administration..its rare case in Mlore where normally ppl r interested only in communal related protests

Rakshith
 - 
Wednesday, 26 Oct 2016

shame on elected representatives..MP (BJP) MLA (CONG) corporators of this area related to both BJP and congress ..all CHORs...i think they just bothered abt their share of bribe from these giant industries..boycott all these in future election

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
December 19,2025

Mangaluru: In a decisive move to tackle the city’s deteriorating sanitation infrastructure, the Mangaluru City Corporation (MCC) has announced a massive ₹1,200 crore action plan to overhaul its underground drainage (UGD) network.

The initiative, spearheaded by Deputy Commissioner and MCC Administrator Darshan HV, aims to bridge "missing links" in the current system that have left residents grappling with overflowing sewage and environmental hazards.

The Breaking Point

The announcement follows a high-intensity phone-in session on Thursday, where the DC was flooded with grievances from frustrated citizens. Residents, including Savithri from Yekkur, described a harrowing reality: raw sewage from apartments leaking into stormwater drains, creating a "permanent stink" and turning residential zones into mosquito breeding grounds.

"We are facing immense difficulties due to the stench and the health risks. Local officials have remained silent until now," one resident reported during the session.

The Strategy: A Six-Year Vision

DC Darshan HV confirmed that the proposed plan is not a temporary patch but a comprehensive six-year roadmap designed to accommodate Mangaluru’s projected population growth. Key highlights of the plan include:

•    Infrastructure Expansion: Laying additional pipelines to connect older neighborhoods to the main grid.

•    STP Crackdown: Stricter enforcement of Sewage Treatment Plant (STP) regulations. While new apartments are required to have functional STPs, many older buildings lack them entirely, and several newer units are reportedly non-functional.

•    Budgetary Push: The plan has already been discussed with the district in-charge minister and the Secretary of the Urban Development Department. It is slated for formal presentation in the upcoming state budget.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.