Cyclone Titli leaves 8 dead in AP, causes widespread damage in Odisha

Agencies
October 11, 2018

Amaravati(AP)/Bhubaneswar, Oct 11: Cyclone 'Titli' made landfall on the eastern coast of the country early on Thursday claiming eight lives and wrecking havoc in Srikakulam and Vizianagaram districts of Andhra Pradesh, while causing widespread damage in neighbouring Odisha.

While no loss of lives were reported in Odisha, the "very severe" cyclonic storm left a trail of destruction in Gajapati and Ganjam districts of state, uprooting trees, electric poles and damaging hutments.

According to the India Meteorological Department (IMD), Cyclone Titli made its landfall near Palasa in Srikakulam district, south west of Gopalpur in Odisha with an estimated maximum sustained surface wind speed of 140-150 kmph gusting to 165 kmph between 4.30 am and 5.30 am.

The Andhra Pradesh State Disaster Management Authority (SDMA) said the cyclone caused widespread damage in Srikakulam and Vizianagaram, and threw normal life out of gear as heavy to very heavy rains lashed the two north coastal districts districts since late Wednesday night.

While a 62-year-old woman died at Gudivada Agraharam village after a tree fell on her, a 55-year-old man died in a house collapse at Rotanasa village in Srikakulam district, the SDMA said.

The Andhra Pradesh Chief Minister's Office (CMO) said the six others killed were fishermen who had ventured into the sea.

Of the 67 fishing boats that had gone into the sea over the last few days from Kakinada in East Godavari district, 65 had returned to the shore safely, the CMO said, adding efforts were on to bring back the remaining two boats.

The road network in Srikakulam district suffered extensive damage, while the power distribution network was also severely affected. More than 2,000 electric poles were uprooted by strong winds.

The Eastern Power Distribution Company, that caters to the electricity needs of the north coastal districts of Andhra Pradesh, reported that the distribution system for 4,319 villages and six towns in Srikakulam district was affected.

In Odisha, Cyclone Titli led to very heavy rainfall in Ganjam, Gajapati and Puri districts and caused minor damage to power supply and communication.

In all, eight districts -- Ganjam, Gajapati, Khurda, Puri, Jagatsinghpur, Kendrapara, Bhadrak and Balasore -- have been affected by the cyclonic storm, Special Relief Commissioner B P Sethi said.

"There has been no major destruction or report of casualty from any part of the state so far. Some damages like uprooting of trees and electric poles and damage to hutments were reported from Ganjam and Gajapati districts," he said.

Power supply and telephone links got disrupted, and road communication snapped due to uprooted trees at many places in Gajapati district, Sethi said, adding efforts are now on to clear the blocked roads and to restore power supply in affected areas.

Odisha Chief Minister Naveen Patnaik reviewed the situation in the state and instructed officials to expedite restoration efforts once the situation improves. He also directed the officials concerned to provide relief materials to cyclone-affected people.

"The chief minister gave instruction to send two more teams of NDRF to Gajapati where extensive damage has been caused to roads, hutments, electric and telephone poles," Chief Secretary A P Padhi said.

Thirteen teams of the National Disaster Response Force (NDRF) and Orissa Disaster Rapid Action Force have been deployed in affected areas along with fire brigade personnel.

"The damage is less than what we had feared," the chief secretary said.

Padhi said the state government on Wednesday evacuated over three lakh people to safe places, which helped avoid loss of life in the natural calamity.

The evacuees are housed in 1,112 shelters where food and sanitation facilities are available, he said.

Traffic on the Chennai-Kolkata National Highway was hit at places due to uprooted trees.

According to East Coast Railway sources, train services between Khurda Road in Odisha and Vizianagaram in Andhra Pradesh remained suspended since 10 pm Wednesday.

"We are optimistic about restoration of train services on the route by (Thursday) evening," said East Coast Railway Chief PRO J P Mishra.

Some railway station buildings were damaged at a few places, including in Palasa. Signal poles and overhead electric masts were damaged at places between Palasa and Kottabomali stations, he said.

The South Central Railway as well as the East Coast Railway cancelled several trains while some were terminated midway. A few express trains were diverted.

Horticulture crops suffered extensive damage in Srikakulam district while paddy suffered damage in Vizianagaram. Coconut plantations, banana and mango trees were the worst hit in the cyclonic storm, according to a preliminary report by the SDMA.

The cyclonic storm system is now moving northeastwards towards Gangetic West Bengal across Odisha and will weaken gradually, the IMD said.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
December 20,2025

train.jpg

At least seven elephants were killed and one calf injured after a herd collided with the Sairang-New Delhi Rajdhani Express in Assam's Hojai on Saturday morning, leading to disruption of rail services. 

The Sairang-New Delhi Rajdhani Express struck a herd of elephants, resulting in the derailment of the locomotive and five coaches. No passenger casualties or injuries were reported, officials said.

The New Delhi-bound train met with the accident around 2.17 am, PTI reported. The Sairang-New Delhi Rajdhani Express connects Mizoram's Sairang (near Aizawl) to Anand Vihar Terminal (Delhi). 

Railway has issued helpline numbers at the Guwahati Railway Station:-

•    0361-2731621
•    0361-2731622
•    0361-2731623

The accident site is located about 126 km from Guwahati. Following the incident, accident relief trains and railway officials rushed to the spot to initiate rescue operations.

Train Services Disrupted

Sources said that due to the derailment and elephant body parts scattered on the tracks, train services to Upper Assam and other parts of the Northeast were affected.

Passengers from the affected coaches were temporarily accommodated in vacant berths available in other coaches of the train. Once the train reaches Guwahati, additional coaches will be attached to accommodate all passengers, after which the train will resume its onward journey.

The incident occurred at a location that is not a designated elephant corridor. The loco pilot, upon spotting the herd on the tracks, applied emergency brakes. Despite this, the elephants dashed into the train, leading to the collision and derailment.

Last month, an elephant was killed after being hit by a train in Dhupguri in West Bengal's Jalpaiguri district. The incident took place on November 30. 

The adult elephant was killed on the spot, and a calf was discovered lying injured beside the tracks. 

Over 70 Elephants Killed In Train Collisions Over Last 5 Years

At least 79 elephants have died in train collisions across the country in the last five years, the Environment Ministry had informed Parliament in August.

In a written reply in the Lok Sabha, Minister of State for Environment Kirti Vardhan Singh had said the figure is based on reports from state governments and Union Territory administrations for the period 2020-21 to 2024-25.

He said that the ministry does not maintain consolidated data on the deaths of other wild animals on railway tracks, including in designated elephant corridors.

Singh confirmed that three elephants, including a mother and her calf, were killed on July 18 this year after being hit by a speeding express train on the Kharagpur-Tatanagar section in West Bengal's Paschim Midnapore district. The incident took place near Banstala between Jhargram and Banstala stations.

The minister said several measures have been taken jointly by the Environment Ministry and the Railways to prevent such accidents.

These include imposing speed restrictions in elephant habitats, pilot projects such as seismic sensor-based detection of elephants near tracks and construction of underpasses, ramps and fencing at vulnerable points.

The Wildlife Institute of India, in consultation with the ministry and other stakeholders, has also issued guidelines titled 'Eco-friendly Measures to Mitigate Impacts of Linear Infrastructure' to help agencies design railways and other projects in ways that reduce human-animal conflicts.

Singh added that capacity-building workshops were conducted for railway officials at the Wildlife Institute of India in 2023 and 2024 to raise awareness on elephant conservation and protection.

A detailed report titled 'Suggested Measures to Mitigate Elephant & Other Wildlife Train Collisions on Vulnerable Railway Stretches in India' had also been prepared after surveys across 127 railway stretches covering 3,452 km.

Of these, 77 stretches spanning 1,965 km in 14 states were prioritised for mitigation, with site-specific interventions suggested. 

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
December 5,2025

indigoCEO.jpg

New Delhi, Dec 5: IndiGo CEO Pieter Elbers issued a public apology this evening after more than a thousand flights were cancelled today, making it the "most severely impacted day" in terms of cancellations. The biggest airline of the country cancelled "more than half" of its daily number of flights on Friday, said Elbers. He also said that even though the crisis will persist on Saturday, the airline anticipates fewer than 1,000 flight cancellations.

"Full normalisation is expected between December 10 and 15, though IndiGo cautions that recovery will take time due to the scale of operations," the IndiGo CEO said. 

IndiGo operates around 2,300 domestic and international flights daily.

Pieter Elbers, while apologising for the major inconvenience due to delays and cancellations, said the situation is a result of various causes.

The crisis at IndiGo stems from new regulations that boost pilots' weekly rest requirements by 12 hours to 48 and allow only two night-time landings per week, down from six. IndiGo has attributed the mass cancellations to "misjudgment and planning gaps".

Elbers also listed three lines of action that the airline will adopt to address the issue.

"Firstly, customer communication and addressing your needs, for this, messages have been sent on social media. And just now, a more detailed communication with information, refunds, cancellations and other customer support measures was sent," he said.

The airline has also stepped up its call centre capacity.

"Secondly, due to yesterday's situation, we had customers stranded mostly at the nation's largest airports. Our focus was for all of them to be able to travel today itself, which will be achieved. For this, we also ask customers whose flights are cancelled not to come to the airports as notifications are sent," the CEO said.

"Thirdly, cancellations were made for today to align our crew and planes to be where they need to start tomorrow morning afresh. Earlier measures of the last few days, regrettable, have proven not to be enough, but we have decided today to reboot all our systems and schedules, resulting in the highest numbers of cancellations so far, but imperative for progressive improvements starting from tomorrow," he added.

As airports witnessed chaotic scenes, the Directorate General of Civil Aviation (DGCA) stepped in to grant IndiGo a temporary exemption from stricter night duty rules for pilots. It also allowed substitution of leaves with a weekly rest period. 

Civil Aviation Minister Ram Mohan Naidu has said a high-level inquiry will be ordered and accountability will be fixed.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
December 6,2025

indigoticket.jpg

With IndiGo flight disruptions impacting thousands of passengers, the airline on Saturday said that it will offer full waiver on all cancellations/reschedule requests for travel bookings between December 5, 2025 and December 15, 2025.

Earlier in the day, the civil aviation ministry had directed the airline to complete the ticket refund process for the cancelled flights by Sunday evening, as well as ensure baggage separated from the travellers are delivered in the next two days.

In a post on X, titled 'No questions asked', IndiGo wrote, "In response to recent events, all refunds for your cancellations will be processed automatically to your original mode of payment."

"We are deeply sorry for the hardships caused," it further added.

Several passengers, however, complained of not getting full refund as promised by the airline.

Netizens have shared screenchots of getting charged for airline cancellation fee and convenience fee.

"Please tell me why u have did this airline cancellation charges when u say full amount will be refunded (sic)," a user wrote sharing a screenshot of the refund page.

"Well, but you have still debited the convenience charges," wrote another.

Passengers have also raised concerns about the "cancel" option being disabled on the IndiGo app. "First enable the 'Cancel' button on your App & offer full refund on tickets cancelled by customers between the said dates," wrote a user.

A day after the country's largest airline, IndiGo, cancelled more than 1,000 flights and caused disruptions for the fifth day on Saturday, the ministry said that any delay or non-compliance in refund processing will invite immediate regulatory action.

The refund process for all cancelled or disrupted flights must be completed by 8 pm on Sunday, the ministry said in a statement.

"Airlines have also been instructed not to levy any rescheduling charges for passengers whose travel plans were affected by cancellations," it said.

On Saturday, more than 400 flights were cancelled at various airports.

IndiGo has also been instructed to set up dedicated passenger support and refund facilitation cells.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.