Mangaluru: In a decisive move to tackle the city’s deteriorating sanitation infrastructure, the Mangaluru City Corporation (MCC) has announced a massive ₹1,200 crore action plan to overhaul its underground drainage (UGD) network.
The initiative, spearheaded by Deputy Commissioner and MCC Administrator Darshan HV, aims to bridge "missing links" in the current system that have left residents grappling with overflowing sewage and environmental hazards.
The Breaking Point
The announcement follows a high-intensity phone-in session on Thursday, where the DC was flooded with grievances from frustrated citizens. Residents, including Savithri from Yekkur, described a harrowing reality: raw sewage from apartments leaking into stormwater drains, creating a "permanent stink" and turning residential zones into mosquito breeding grounds.
"We are facing immense difficulties due to the stench and the health risks. Local officials have remained silent until now," one resident reported during the session.
The Strategy: A Six-Year Vision
DC Darshan HV confirmed that the proposed plan is not a temporary patch but a comprehensive six-year roadmap designed to accommodate Mangaluru’s projected population growth. Key highlights of the plan include:
• Infrastructure Expansion: Laying additional pipelines to connect older neighborhoods to the main grid.
• STP Crackdown: Stricter enforcement of Sewage Treatment Plant (STP) regulations. While new apartments are required to have functional STPs, many older buildings lack them entirely, and several newer units are reportedly non-functional.
• Budgetary Push: The plan has already been discussed with the district in-charge minister and the Secretary of the Urban Development Department. It is slated for formal presentation in the upcoming state budget.
Comments
Dear Sir,
We are very Happy the way you are trying to solve the problems in UUDA. I am facing a problem . May I know the status of land conversion for housing purpose. I have applied for the same from 80 Badagabettu village last year. On March 18, Mr.Raghupathi Bhat sir has raised this issue in assembly and requested to solve the problem within 15 days. we are waiting to construct a house. Please do something urgently for this.
Thanks and regards
Dr Krishnananda
9964015487
Hi Sir,
I have tried to reach the friday programme and in mid call disconnected and later not reachable.
Could you please let us know the process to apply the akrama sakrama land convert to residential purpose.
Kindly do the needfull.
Add new comment